Quick answers
What is this project?
Proposed Project of "Granite and Dolostone Ballast Gitti Mining Project" at Gata No. 343 Mining Lease Area 1.930 ha., Village- Dayalpura, Tehsil – Charkhari, District: Mahoba, Uttar Pradesh,Prop. Shri Jitendra Singh,Lease Area 1.930 ha is an approved mining project in Dayalpura, Charkhari, Mahoba, Uttar Pradesh. The site covers 4.8 acres.
Who is building it?
The applicant is Jitendra Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Mar 2026), as of 27 Nov 2026.
Where is it?
In Dayalpura, Charkhari, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 4.8 acres.
When was it filed?
The application was filed on 8 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Mar 2026 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jitendra Singh |
| Land area | 4.8 acres (1.9 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Dayalpura |
| Taluk / tehsil | Charkhari |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03364 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.8 acres, this one is larger than 71% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Dayalpura, Charkhari, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 650 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 650 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 700 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 700 m away
- Building Stone Granite Granite (Khanda,Boulder, Bailast (Gitti)) mining… — environmental approval granted, 750 m away
- Building Stone Granite Granite (Khanda,Boulder, Bailast (Gitti)) mining… — cleared for impact study, 750 m away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — forest land use approved, 1.5 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — cleared for impact study, 2.3 km away
More from Jitendra Singh in Mahoba
- Proposed Project of "Granite and Dolostone Ballast Gitty Mining Project" at… — under environmental review
- Proposed Project of "Granite and Dolostone Ballast Gitty Mining Project at"… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.