What is Developing? Open the mapMap

Cleared for impact studyIndustry · Meerut, Uttar Pradesh

Proposed Integrated Manufacturing & Logistic Cluster (IMLC) – Meerut at Villages- Bijoli, and Kharkhauda, Tehsil- Sadar, District- Meerut, State-Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA).

Proposed Integrated Manufacturing & Logistic Cluster (IMLC) – Meerut at Villages- Bijoli, and Kharkhauda, Tehsil- Sadar, District- Meerut, State-Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) is a proposed industrial project in Bijauli, Meerut, Uttar Pradesh. The site covers 528.6 acres. Its stated project cost is ₹1,223.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Nov 2025).

See it on the live map All projects in Meerut

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Integrated Manufacturing & Logistic Cluster (IMLC) – Meerut at Villages-…

Project details

StatusCleared for impact study
Status since24 Nov 2025
Application filed17 Oct 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantUttar Pradesh Expressways Industrial Development Authority (Upeida)
Land area528.6 acres (213.9 ha)
Project cost₹1,223.9 crore
Village / localityBijauli
Taluk / tehsilMeerut
DistrictMeerut
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03395

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Jun 2026Environmental approval granted528.6 acres₹1,223.9 crore
Early planning filed 17 Oct 2025 (this page)Cleared for impact study528.6 acres₹1,223.9 crore

In context

18 applications in Meerut since January 2022 are in the same category (Industry): 11 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 528.6 acres, this one is larger than 89% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bijauli, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.