One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Integrated Manufacturing & Logistic Cluster (IMLC) – Meerut at Villages-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Nov 2025 |
| Application filed | 17 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 528.6 acres (213.9 ha) |
| Project cost | ₹1,223.9 crore |
| Village / locality | Bijauli |
| Taluk / tehsil | Meerut |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03395 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Jun 2026 | Environmental approval granted | 528.6 acres | ₹1,223.9 crore |
| Early planning filed 17 Oct 2025 (this page) | Cleared for impact study | 528.6 acres | ₹1,223.9 crore |
In context
18 applications in Meerut since January 2022 are in the same category (Industry): 11 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 528.6 acres, this one is larger than 89% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bijauli, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) – Meerut at… — environmental approval granted, 0 m away
- Industrial Shed/Factory for Manufacturing of Aluminium Beverage Cans — initial checks, 300 m away
- Proposed 1,600 TPA Sintered NdFeB Magnet Manufacturing Unit (Secondary… — under environmental review, 600 m away
- The Proposed 1,600 TPA Sintered NdFeB Magnet Manufacturing Unit (Secondary… — initial checks, 600 m away
- Diversion of 0.4630 Hectare Protected Forest Land for Non-Forestry Use for 8… — forest land use approved, 1.1 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — forest land use approved, 3.2 km away
- Widening and Strengthening of Chandsara-Phaphunda Marg — forest land use approved, 5.3 km away
- 11 KV HT line to 33/11 KV Sub station Naglapatu of DFCCIL — lapsed, 6.9 km away
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.