Project details
| Status | Initial checks |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 29 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Lohum Magnets & Energy Solutions Private Limited |
| Land area | 48.2 acres (19.5 ha) |
| Project cost | ₹561 crore |
| Village / locality | Bijauli |
| Taluk / tehsil | Meerut |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07462 |
In context
18 applications in Meerut since January 2022 are in the same category (Industry): 11 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 48.2 acres, this one is larger than 72% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bijauli, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 1,600 TPA Sintered NdFeB Magnet Manufacturing Unit (Secondary… — under environmental review, 0 m away
- Industrial Shed/Factory for Manufacturing of Aluminium Beverage Cans — initial checks, 350 m away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) – Meerut at… — environmental approval granted, 600 m away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) – Meerut at… — cleared for impact study, 600 m away
- Diversion of 0.4630 Hectare Protected Forest Land for Non-Forestry Use for 8… — forest land use approved, 1.3 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — forest land use approved, 3.3 km away
- Widening and Strengthening of Chandsara-Phaphunda Marg — forest land use approved, 5.8 km away
- Proposed Synthetic Organic Chemicals & API Intermediates Manufacturing Unit at… — environmental approval granted, 7 km away
More from Lohum Magnets & Energy Solutions Private Limited in Meerut
- Proposed 1,600 TPA Sintered NdFeB Magnet Manufacturing Unit (Secondary… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.