Project details
| Official title | No increase in Pollution Load for Proposed increase in Pulp production Capacity from 200 TPD to 250 TPD in the existing Writing Printing Paper Plant (300 TPD) At Village Makhyali, Tehsil Muzaffarnagar, District Muzaffarnagar, Uttar Pradesh by M/s Bindals Papers Mills Limited |
|---|---|
| Status | Initial checks |
| Status since | 26 Sept 2025 |
| Application filed | 26 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bindals Papers Mills Limited |
| Use | Industrial |
| Land area | 50.8 acres (20.6 ha) |
| Plot area | 2,05,630 m² (22,13,381 sq ft) |
| Project cost | ₹628 crore |
| Village / locality | Makhiali |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03514 |
In context
26 applications in Muzaffarnagar since January 2022 are in the same category (Buildings & townships): 9 approved, 16 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 50.8 acres, this one is larger than 92% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makhiali, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Common Bio-medical Waste Treatment Facility (CBWTF) — lapsed, 600 m away
- Expansion of Paper Production Capacity from 180 TPD to 300 TPD & Agro Residue… — lapsed, 700 m away
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — more information requested, 900 m away
- Laying of Electrical Cable 33 kv U G XLPE cables M/s Saptam Decor Pvt. Ltd.… — forest land use approved, 1.5 km away
- Laying of Electrical Cable 33 kv U G XLPE cables M/s Silverton Pulp and Papers… — forest land use approved, 2.2 km away
- Modification in Induction Furnace from 15 Ton to 20 Ton for Existing… — under environmental review, 2.9 km away
- Modification in Induction Furnace from 15 ton to 20 ton for Existing… — returned to applicant, 2.9 km away
- Production from 90 MTD Billet (27000 MTPA) (Existing) to 350 MTD TMT Bars/… — environmental approval granted, 3.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.