Project details
| Official title | Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line along Muzaffarngar- Bhopa Marg (Pwd Road) From Ch.79.500 Km to Ch. 84.400 Km RHS for Approx 4.900 Km in District-Muzaffarnagar, Uttar Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 16 Nov 2026 |
| Application filed | 31 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Raj Kumar Singh |
| Land area | 2,000 m² |
| Forest land | 1,960 m² |
| Project cost | ₹1.9 crore |
| Village / locality | Bhandura |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06499 |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Roads & highways): 6 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.5 acres, this one is smaller than 85% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhandura, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Electrical Cable 33 kv U G XLPE cables M/s Saptam Decor Pvt. Ltd.… — forest land use approved, 600 m away
- Expansion of Paper Production Capacity from 180 TPD to 300 TPD & Agro Residue… — lapsed, 750 m away
- No increase in Pollution Load for Proposed increase in Pulp production… — initial checks, 900 m away
- Common Bio-medical Waste Treatment Facility (CBWTF) — lapsed, 950 m away
- Laying of Electrical Cable 33 kv U G XLPE cables M/s Silverton Pulp and Papers… — forest land use approved, 1.3 km away
- Modification in Induction Furnace from 15 Ton to 20 Ton for Existing… — under environmental review, 2.1 km away
- Modification in Induction Furnace from 15 ton to 20 ton for Existing… — returned to applicant, 2.1 km away
- Production from 90 MTD Billet (27000 MTPA) (Existing) to 350 MTD TMT Bars/… — environmental approval granted, 2.7 km away
More from Raj Kumar Singh in Muzaffarnagar
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — more information requested
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — forest land use approved
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.