Quick answers
What is this project?
"Ordinary Earth Mining" Project at Gata No.- 596, Village- Phulrai Mughal Garhi, Tehsil- Sikandra Rao, District- Hathras, Uttar Pradesh. (Area-1.4313 Ha) Pop. Shri Uma Shankar is an approved mining project in Phulrai Mughalgarhi, Sikandra Rao, Hathras, Uttar Pradesh. The site covers 3.5 acres.
Who is building it?
The applicant is Uma Shnkar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 May 2025), as of 27 Nov 2026.
Where is it?
In Phulrai Mughalgarhi, Sikandra Rao, Hathras, Uttar Pradesh.
How big is it?
It has a stated cost of ₹19 lakh and a site of 3.5 acres.
When was it filed?
The application was filed on 22 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 May 2025 |
| Application filed | 22 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Uma Shnkar |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹19 lakh |
| Village / locality | Phulrai Mughalgarhi |
| Taluk / tehsil | Sikandra Rao |
| District | Hathras |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03579 |
In context
47 applications in Hathras since January 2022 are in the same category (Mining): 32 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.5 acres, this one is larger than 70% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 13.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Phulrai Mughalgarhi, Sikandra Rao, Hathras, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining" Project at Gata No.- 596, Village- Phulrai Mughal… — initial checks, 50 m away
- "Ordinary Earth Mining" Project at Gata No.- 642, 593, 640, 744, Village-… — lapsed, 300 m away
- "Ordinary Soil Mining" Project at Gata No.- 699, Village- Phulrai Mughal… — environmental approval granted, 650 m away
- Diversion of 0.2068 Hectare of Protected Forest Land Under Social Forestry… — forest land use approved, 1.2 km away
- "Ordinary Earth Mining" Project at Gata No.- 533, 537, Village- Phulrai Mughal… — environmental approval granted, 1.3 km away
- "Ordinary Soil Mining" Project at Gata No.- 429ब, 430अ, 430ब, 431, Village-… — initial checks, 1.8 km away
- Amended BharatNet Project (SikandraRao-Hathras) — lapsed, 1.9 km away
- Chandpura Ordinary Soil Quarry — lapsed, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.