Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 699, Village- Phulrai Mughal Garhi, Tehsil- Sikandra Rao, District- Hathras, Uttar Pradesh. (Area-0.7870Ha). Shri Bhuvansesh Kumar is an approved mining project in Phulrai Mughalgarhi, Sikandra Rao, Hathras, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Bhuvanesh Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 May 2025), as of 27 Nov 2026.
Where is it?
In Phulrai Mughalgarhi, Sikandra Rao, Hathras, Uttar Pradesh.
How big is it?
It has a stated cost of ₹16 lakh and a site of 2 acres.
When was it filed?
The application was filed on 4 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 May 2025 |
| Application filed | 4 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bhuvanesh Kumar |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Phulrai Mughalgarhi |
| Taluk / tehsil | Sikandra Rao |
| District | Hathras |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03612 |
In context
47 applications in Hathras since January 2022 are in the same category (Mining): 32 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Phulrai Mughalgarhi, Sikandra Rao, Hathras, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mining" Project at Gata No.- 642, 593, 640, 744, Village-… — lapsed, 500 m away
- "Ordinary Earth Mining" Project at Gata No.- 596, Village- Phulrai Mughal… — environmental approval granted, 650 m away
- "Ordinary Soil Mining" Project at Gata No.- 596, Village- Phulrai Mughal… — initial checks, 650 m away
- "Ordinary Earth Mining" Project at Gata No.- 533, 537, Village- Phulrai Mughal… — environmental approval granted, 750 m away
- Diversion of 0.2068 Hectare of Protected Forest Land Under Social Forestry… — forest land use approved, 1.4 km away
- "Ordinary Soil Mining" Project at Gata No.- 429ब, 430अ, 430ब, 431, Village-… — initial checks, 2.4 km away
- Amended BharatNet Project (SikandraRao-Hathras) — lapsed, 2.4 km away
- Chandpura Ordinary Soil Quarry — lapsed, 2.7 km away
More from Bhuvanesh Kumar in Hathras
- "Ordinary Earth Mining" Project at Gata No.- 533, 537, Village- Phulrai Mughal… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.