One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of "Gitty/Boulder (Dolostone) Mining Project" located at Gata no- 7557…
Project details
| Official title | Proposed Project of "Gitty/Boulder (Dolostone) Mining Project" located at Gata no- 7557 मि०, 7558 मि०, 7560 मि०, 7561 मि० (Lease Area 1.500 Ha) in Village- Billi Markundi, Tehsil- Obra & District- Sonbhadra, U.P., Proponent- Smt. Meera Devi |
|---|---|
| Status | Cleared for impact study |
| Status since | 10 Jan 2026 |
| Application filed | 28 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mira Devi |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Kharaitiya |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03584 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Jun 2026 | Environmental approval granted | 3.7 acres | ₹99 lakh |
| Early planning filed 28 Oct 2025 (this page) | Cleared for impact study | 3.7 acres | ₹99 lakh |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 58% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 10.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 47 mining leases have applied within 5 km.
Where it is
Kharaitiya, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Gitty/Boulder (Dolostone) Mining Project" located at Gata… — environmental approval granted, 0 m away
- Billi Markundi, Gitti, Boulder (Dolo Stone) Mining Project (Area 0.9918 Ha ) — environmental approval granted, 350 m away
- Filling of ash emitted from units of Obra 'C' Civil Construction Division-1… — lapsed, 400 m away
- Proposed Gitti/Boulder (Dolo Stone) Mining Project of M/s Shahpur Stone Works… — returned to applicant, 450 m away
- Proposed Gitti/Boulder (Dolo Stone) Mining project of M/s Shahpur Stone Works… — lapsed, 450 m away
- Proposed Gitti/Boulder (Dolo Stone) Mining Project of M/s Shahpur Stone Works… — environmental approval granted, 450 m away
- Billi Markundi, Gitti, Boulder (Dolo Stone) Mining Project (Area 1.967 Ha or… — environmental approval granted, 550 m away
- Billi Markundi, Gitti, Boulder (Dolo Stone) Mining Project — cleared for impact study, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.