Quick answers
What is this project?
Sand Mining Gata No. 598क, 598ख, Area- 3.70 ha, Village – Village Bholapur Shankarpur, Tehsil - Meerganj, District – bareilly, Uttar Pradesh is an approved mining project in Bholapur Shankhapur, Meerganj, Bareilly, Uttar Pradesh. The site covers 9.1 acres.
Who is building it?
The applicant is Shubham.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 May 2025), as of 27 Nov 2026.
Where is it?
In Bholapur Shankhapur, Meerganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 9.1 acres.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 May 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shubham |
| Land area | 9.1 acres (3.7 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Bholapur Shankhapur |
| Taluk / tehsil | Meerganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03595 |
In context
6 applications in Bareilly since January 2022 are in the same category (Mining): 5 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Bholapur Shankhapur, Meerganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Ordinary Sand Mining — environmental approval granted, 4.9 km away
- River Bed Ordinary Sand Mining — cleared for impact study, 4.9 km away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Bharat… — lapsed, 6.8 km away
- Proposed Protected Forest Land to be Diverted for Construction of 02 lane rail… — under forest review, 7.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Green… — forest land use approved, 8.4 km away
- Proposed Protected Forest Land to be Diverted for approach access to… — lapsed, 9.3 km away
- Protected Forest Land Proposed to be diverted for Hindustan petroleum… — lapsed, 9.4 km away
- Proposed Protected Forest Land to be Diverted for approach access to Plot of… — lapsed, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.