Quick answers
What is this project?
Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Green Valley Hotel & Resort on Bareilly-Rampur Road, Old NH-24 KM-0.01 CH. No. 0.895 at Gata/Khasra No–65, Village: - Parsakheda, Tehsil: -Sadar, District: - Bareilly. (UP) is an approved hotel project in Parsa Kheda, Bareilly, Uttar Pradesh. The site covers 4.1 acres.
Who is building it?
The applicant is Green Vally Hotel and Resort.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Sept 2025), as of 27 Nov 2026.
Where is it?
In Parsa Kheda, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5 crore; a site of 4.1 acres and 200 m² of forest land.
When was it filed?
The application was filed on 5 May 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Sept 2025 |
| Application filed | 5 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Green Vally Hotel and Resort |
| Use | Hotel |
| Land area | 4.1 acres (1.6 ha) |
| Forest land | 200 m² |
| Project cost | ₹5 crore |
| Village / locality | Parsa Kheda |
| Taluk / tehsil | Bareilly |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05850 |
In context
14 applications in Bareilly since January 2022 are in the same category (Buildings & townships): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.1 acres, this one is smaller than 79% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parsa Kheda, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for approach access to… — lapsed, 1.7 km away
- Bhumi Vikas Evam Grahsthan Scheme — environmental approval granted, 2.4 km away
- Bhumi Vikas Evam Grahsthan Scheme — cleared for impact study, 2.4 km away
- Protected Forest Land Proposed to be diverted for Hindustan petroleum… — lapsed, 2.5 km away
- Proposed Protected Forest Land to be Diverted for approach access to Plot of… — lapsed, 2.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 4.6 km away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Bharat… — lapsed, 4.8 km away
- "no Increase in Pollution Load Certificate" for Proposing to Utilize Grains As… — initial checks, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.