Quick answers
What is this project?
"Sand Stone Quartizite Bailast Gitti" Project at Gata No.- 180/2, Village- Bhagoti Dei, Tehsil- Chunar, District- Mirzapur, U.P. (Applied Area : 2.0200 ha.) M/s Shrinanak Minerals Pvt. Ltd., Director- Shri Trilok Singh Rathore S/o Shri Makhan Singh Rathore is a proposed mining project in Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Shrinanak Minerals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 May 2025), as of 27 Nov 2026.
Where is it?
In Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹73 lakh and a site of 5 acres.
When was it filed?
The application was filed on 12 Mar 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand Stone Quartizite Bailast Gitti" Project at Gata No.- 180/2, Village- Bhagoti Dei,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 May 2025 |
| Application filed | 12 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shrinanak Minerals Private Limited |
| Land area | 5 acres (2 ha) |
| Project cost | ₹73 lakh |
| Village / locality | Bhagwatidei |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03614 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Nov 2025 | Environmental approval granted | 5 acres | ₹73 lakh |
| Early planning filed 12 Mar 2025 (this page) | Cleared for impact study | 5 acres | ₹73 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5 acres, this one is larger than 70% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 23 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 80 mining leases have applied within 5 km.
Where it is
Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand Stone Quartizite Bailast Gitti" Project at Gata No.- 180/2, Village-… — environmental approval granted, 0 m away
- Proposed Project of Sand Stone Quartizite Ballast Gitti Mining Project at Gata… — under environmental review, 150 m away
- "Building Stone (Sandstone)" mine — lapsed, 150 m away
- "Building Stone (Sandstone)" mine — environmental approval granted, 200 m away
- "Building Stone (Sandstone)" mine — cleared for impact study, 200 m away
- "Building Stone, Sand Stone" Project at Gata No.-180/2 , Village- Bhagoti Dei,… — environmental approval granted, 200 m away
- Rampur Dhabahi Building stone Sand Stone Mining project — environmental approval granted, 200 m away
- Rampur Dhabahi Building stone Sand Stone Mining project — cleared for impact study, 200 m away
All 19 Shrinanak Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.