Quick answers
What is Rampur Dhabahi Building stone Sand Stone Mining project?
Rampur Dhabahi Building stone Sand Stone Mining project is an approved mining project in Rampur Dhaboi, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Nilama Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Dec 2023), as of 27 Nov 2026.
Where is it?
In Rampur Dhaboi, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹41 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 29 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Dec 2023 |
| Application filed | 29 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nilama Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹41 lakh |
| Village / locality | Rampur Dhaboi |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01307 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Dec 2023 (this page) | Environmental approval granted | 2.5 acres | ₹41 lakh |
| Early planning filed 30 Jan 2023 | Cleared for impact study | 2.5 acres | ₹41 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.
8 other mining leases have applied within 500 m of this site; together with this one they cover 25 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 80 mining leases have applied within 5 km.
Where it is
Rampur Dhaboi, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rampur Dhabahi Building stone Sand Stone Mining project — cleared for impact study, 0 m away
- "Building Stone (Sandstone)" mine — environmental approval granted, 150 m away
- "Building Stone (Sandstone)" mine — cleared for impact study, 150 m away
- "Sand Stone Quartizite Bailast Gitti" Project at Gata No.- 180/2, Village-… — cleared for impact study, 200 m away
- "Sand Stone Quartizite Bailast Gitti" Project at Gata No.- 180/2, Village-… — environmental approval granted, 200 m away
- Proposed Project of Sand Stone Quartizite Ballast Gitti Mining Project at Gata… — under environmental review, 300 m away
- Proposed "Building Stone (Sand Stone)" Project at Gata No.- 180/2, Village-… — lapsed, 300 m away
- "Building Stone (Sandstone)" mine — lapsed, 300 m away
More from Nilama Singh in Mirzapur
- Sonpur Building stone Sand Stone Mining project — environmental approval granted
- Sindhora Building stone Sand Stone Mining project — environmental approval granted
- Sonpur Building stone Sand Stone Mining project — cleared for impact study
- Sindhora Building stone Sand Stone Mining project — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.