Quick answers
What is "Ordinary Sand Mining" from Riverbed of Yamuna River?
"Ordinary Sand Mining" from Riverbed of Yamuna River is a proposed mining project in Kharka, Bhognipur, Kanpur Dehat, Uttar Pradesh. The site covers 45.3 acres.
Who is building it?
The applicant is Gyan Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kharka, Bhognipur, Kanpur Dehat, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3 crore and a site of 45.3 acres.
When was it filed?
The application was filed on 9 May 2025.
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Yamuna River at Village- Kharka-K-02, Gata No.- 389 मि०, 390 मि०, Lease Area- 18.33 ha., Tehsil- Bhognipur, District- Kanpur Dehat, Uttar Pradesh, Project Proponent- Shri Gyan Prakash Gupta |
|---|---|
| Status | More information requested |
| Status since | 1 Sept 2026 |
| Application filed | 9 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gyan Gupta |
| Land area | 45.3 acres (18.3 ha) |
| Project cost | ₹3 crore |
| Village / locality | Kharka |
| Taluk / tehsil | Bhognipur |
| District | Kanpur Dehat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03742 |
In context
32 applications in Kanpur Dehat since January 2022 are in the same category (Mining): 21 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 45.3 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Kharka, Bhognipur, Kanpur Dehat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ordinary Sand mining Project on Yamuna Riverbed — environmental approval granted, 550 m away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — under environmental review, 700 m away
- Nibarri Kachhar Sand Mining Project (Area 16.58 Ha) — under environmental review, 1.1 km away
- Nibarri Kachhar Sand Mining Project (Area 16.58 Ha) — cleared for impact study, 1.1 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" along… — environmental approval granted, 1.2 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" along… — cleared for impact study, 1.2 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" having lease… — environmental approval granted, 1.7 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" having lease… — cleared for impact study, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.