Quick answers
What is Nibarri Kachhar Sand Mining Project (Area 16.58 Ha)?
Nibarri Kachhar Sand Mining Project (Area 16.58 Ha) is a proposed mining project in Kharka, Bhognipur, Kanpur Dehat, Uttar Pradesh. The site covers 41 acres.
Who is building it?
The applicant is Ajay Chandak.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 May 2025), as of 27 Nov 2026.
Where is it?
In Kharka, Bhognipur, Kanpur Dehat, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 41 acres.
When was it filed?
The application was filed on 26 Apr 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 May 2025 |
| Application filed | 26 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ajay Chandak |
| Land area | 41 acres (16.6 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Kharka |
| Taluk / tehsil | Bhognipur |
| District | Kanpur Dehat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03280 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jul 2026 | Under environmental review | 41 acres | ₹60 lakh |
| Early planning filed 26 Apr 2025 (this page) | Cleared for impact study | 41 acres | ₹60 lakh |
In context
32 applications in Kanpur Dehat since January 2022 are in the same category (Mining): 21 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 41 acres, this one is larger than 69% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 84.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Kharka, Bhognipur, Kanpur Dehat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nibarri Kachhar Sand Mining Project (Area 16.58 Ha) — under environmental review, 0 m away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — under environmental review, 450 m away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — more information requested, 1.1 km away
- Proposed Ordinary Sand mining Project on Yamuna Riverbed — environmental approval granted, 1.7 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" along… — environmental approval granted, 2.4 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" along… — cleared for impact study, 2.4 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" having lease… — environmental approval granted, 2.9 km away
- Environment clearance of proposed "Riverbed Ordinary Sand Mining" having lease… — cleared for impact study, 2.9 km away
More from Ajay Chandak in Kanpur Dehat
- "Riverbed Sand/Morrum Mining" along riverbed of Yamuna River at Gata No.138,… — environmental approval granted
- "Riverbed Sand/Morrum Mining" along riverbed of Yamuna River at Gata No.138,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.