What is Developing? Open the mapMap

Cleared for impact studyMining · Ayodhya, Uttar Pradesh

"Ordinary Sand Mining" from Riverbed of Ghaghra River

"Ordinary Sand Mining" from Riverbed of Ghaghra River is a proposed mining project in Gaura Brahman, Sohawal, Ayodhya, Uttar Pradesh. The site covers 291.2 acres. Its stated project cost is ₹93 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Jun 2025).

See it on the live map All projects in Ayodhya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?

"Ordinary Sand Mining" from Riverbed of Ghaghra River is a proposed mining project in Gaura Brahman, Sohawal, Ayodhya, Uttar Pradesh. The site covers 291.2 acres.

Who is building it?

The applicant is Sanjay Yadav.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Jun 2025), as of 27 Nov 2026.

Where is it?

In Gaura Brahman, Sohawal, Ayodhya, Uttar Pradesh.

How big is it?

It has a stated cost of ₹93 lakh and a site of 291.2 acres.

When was it filed?

The application was filed on 23 Apr 2025.

Project details

Official title"Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Manjha Kala, Gata No.- 135ञ, 149घ, 153न & 19क/13, Lease Area- 1.7860 ha., Tehsil- Sohawal, District- Ayodhya, Uttar Pradesh, Project Proponent- Shri Sanjay Kumar Yadav
StatusCleared for impact study
Status since4 Jun 2025
Application filed23 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSanjay Yadav
Land area291.2 acres (117.9 ha)
Project cost₹93 lakh
Village / localityGaura Brahman
Taluk / tehsilSohawal
DistrictAyodhya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03768

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Aug 2026Under environmental review291.2 acres₹93 lakh
Early planning filed 23 Apr 2025 (this page)Cleared for impact study291.2 acres₹93 lakh

In context

57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 291.2 acres, this one is larger than 93% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 306.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Gaura Brahman, Sohawal, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sanjay Yadav in Ayodhya

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.