Environmental approval grantedMining · Mahoba, Uttar Pradesh

Environment clearance of proposed building stone [Khanda, Gitti, Boulder] mine at Gata no. – 512, khand No.–04, Area – 1.214 ha

Environment clearance of proposed building stone [Khanda, Gitti, Boulder] mine at Gata no. – 512, khand No.–04, Area – 1.214 ha is an approved mining project in Gauhari, Mahoba, Uttar Pradesh. The site covers 3 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Mar 2026).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environment clearance of proposed building stone [Khanda, Gitti, Boulder] mine at Gata no. – 512, khand No.–04, Area – 1.214 ha is an approved mining project in Gauhari, Mahoba, Uttar Pradesh. The site covers 3 acres.

Who is building it?

The applicant is Brijendra Pratap Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 30 Mar 2026), as of 27 Nov 2026.

Where is it?

In Gauhari, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹80 lakh and a site of 3 acres.

When was it filed?

The application was filed on 11 Dec 2025.

Project details

Official titleEnvironment clearance of proposed building stone [Khanda, Gitti, Boulder] mine at Gata no. – 512, khand No.–04, Area – 1.214 ha. at Village – Gauhari, Tehsil and District- Mahoba, Uttar Pradesh of Shri Brijendra Pratap Singh.
StatusEnvironmental approval granted
Status since30 Mar 2026
Application filed11 Dec 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantBrijendra Pratap Singh
Land area3 acres (1.2 ha)
Project cost₹80 lakh
Village / localityGauhari
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03781

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Dec 2025 (this page)Environmental approval granted3 acres₹80 lakh
Early planning filed 30 Apr 2025Cleared for impact study3 acres₹80 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 12.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.

Where it is

Gauhari, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.