Quick answers
What is this project?
Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-01 (New), Village- Gauhari, Tehsil- Mahoba, District- Mahoba, U.P. (Leased Area- 1.214 ha. / 3.0 Acre), Lessee- Shri Dinesh Chandra Sahu S/o Shri Kallu Sahu is a lapsed mining project in Gauhari, Mahoba, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Dinesh Chandra Sahu.
Has it been approved?
No. The application was lapsed on 27 Jul 2026, so it is no longer under consideration.
Where is it?
In Gauhari, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹69 lakh and a site of 3 acres.
When was it filed?
The application was filed on 12 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-01 (New),…
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Jul 2026 |
| Application filed | 12 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dinesh Chandra Sahu |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹69 lakh |
| Village / locality | Gauhari |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03872 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Dec 2025 (this page) | Lapsed | 3 acres | ₹69 lakh |
| Early planning filed 25 Jan 2025 | Cleared for impact study | 3 acres | ₹69 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 12.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Gauhari, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-01… — cleared for impact study, 0 m away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 512 Khand-03… — lapsed, 50 m away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 512 Khand-03… — cleared for impact study, 50 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 100 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — cleared for impact study, 100 m away
- Environment clearance of proposed building stone [Khanda, Gitti, Boulder] mine… — environmental approval granted, 100 m away
- Environment clearance of proposed building stone [Khanda, Gitti, Boulder] mine… — cleared for impact study, 100 m away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-06… — lapsed, 250 m away
More from Dinesh Chandra Sahu in Mahoba
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-06… — lapsed
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-06… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.