What is Developing? Open the mapMap

Under environmental reviewMining · Kaushambi, Uttar Pradesh

"Sand/Moram Mining Project" having an area of 10.0 Ha., located at Yamuna River Bed, at Gata No.- 55kh Khand No.- 13/18 to 13/19, Area – 10.00 Ha. Village- Badahari, Tehsil– Manjhanpur, District- Kaushambi, U.P. By Shri Mahesh Chandra S/o Shri Ram Khelawan.

"Sand/Moram Mining Project" having an area of 10.0 Ha., located at Yamuna River Bed, at Gata No.- 55kh Khand No.- 13/18 to 13/19, Area – 10.00 Ha. Village- Badahari, Tehsil– Manjhanpur, District- Kaushambi, U.P. By Shri Mahesh Chandra S/o Shri Ram Khelawan is a proposed mining project in Dedhawal Uparhar, Manjhanpur, Kaushambi, Uttar Pradesh. The site covers 24.7 acres. Its stated project cost is ₹32 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 31 Aug 2026).

See it on the live map All projects in Kaushambi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Moram Mining Project" having an area of 10.0 Ha., located at Yamuna River Bed, at Gata No.- 55kh Khand No.- 13/18 to 13/19, Area – 10.00 Ha. Village- Badahari, Tehsil– Manjhanpur, District- Kaushambi, U.P. By Shri Mahesh Chandra S/o Shri Ram Khelawan is a proposed mining project in Dedhawal Uparhar, Manjhanpur, Kaushambi, Uttar Pradesh. The site covers 24.7 acres.

Who is building it?

The applicant is Mahesh chandra.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Dedhawal Uparhar, Manjhanpur, Kaushambi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹32 lakh and a site of 24.7 acres.

When was it filed?

The application was filed on 20 Sept 2025.

Project details

StatusUnder environmental review
Status since31 Aug 2026
Application filed20 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMahesh chandra
Land area24.7 acres (10 ha)
Project cost₹32 lakh
Village / localityDedhawal Uparhar
Taluk / tehsilManjhanpur
DistrictKaushambi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03789

In context

32 applications in Kaushambi since January 2022 are in the same category (Mining): 20 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 24.7 acres, this one is smaller than 97% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Dedhawal Uparhar, Manjhanpur, Kaushambi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.