Project details
| Official title | Building stone (Granite Khanda/Gitty/Boulder/Red Morrum) Mining Project in Gata No-1078g, Khand No-26, Lease area-2.0240 ha at Village-Gonda, Tehsil-Karwi, District-Chitrakoot, U.P. of M/s Sushil Stone, Prop. Mayank Gupta |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Feb 2026 |
| Application filed | 11 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mayank Gupta |
| Land area | 5 acres (2 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Gonda |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03843 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Dec 2025 (this page) | Environmental approval granted | 5 acres | ₹85 lakh |
| Amendment filed 2 Sept 2025 | Environmental approval granted | 5 acres | ₹85 lakh |
| Early planning filed 7 Apr 2025 | Cleared for impact study | 5 acres | ₹85 lakh |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 85% of them.
15 other mining leases have applied within 500 m of this site; together with this one they cover 86.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Gonda, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to UPEIDA Plans a 15-Kilometre Chitrakoot Link Expressway in Uttar Pradesh (7.5 km away).
Other projects nearby
- Building stone (Granite Khanda/Gitty/Boulder/Red Morrum) Mining Project in… — environmental approval granted, 0 m away
- Building stone (Granite Khanda/Gitty/Boulder/Red Morrum) Mining Project in… — cleared for impact study, 0 m away
- Proposed Building stone (Granite Khanda, Gitty, Boulder) Mining Project in… — environmental approval granted, 100 m away
- Proposed Building stone (Granite Khanda, Gitty, Boulder) Mining Project in… — cleared for impact study, 100 m away
- Building stone (Granite Khanda, Gitty, Boulder) Mining Project in Khasra/Gata… — withdrawn, 100 m away
- Granite-Imarati Patthar (Khanda, Gitty, Boulder, Red Morrum) Mining Project in… — environmental approval granted, 200 m away
- Granite-Imarati Patthar (Khanda, Gitty, Boulder, Red Morrum) Mining Project in… — cleared for impact study, 200 m away
- Building Stone (Granite/ Gitti/ Khanda/ Boulder/ Hilly Red Morrum Mine) — cleared for impact study, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.