Quick answers
What is this project?
Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos. 911/3, 911/4, 911/5, 911/6, and 911/8 Area – 1.6432 ha is an approved mining project in Meoli Kalan, Fatehabad, Agra, Uttar Pradesh. The site covers 2.2 acres.
Who is building it?
The applicant is Suman.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Feb 2026), as of 27 Nov 2026.
Where is it?
In Meoli Kalan, Fatehabad, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹15 lakh and a site of 2.2 acres.
When was it filed?
The application was filed on 25 Sept 2025.
Project details
| Official title | Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos. 911/3, 911/4, 911/5, 911/6, and 911/8 Area – 1.6432 ha at Village- Mewali kala, Tehsil –Fatehabad, District - Agra, Uttar Pradesh of Smt. Suman Devi |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Feb 2026 |
| Application filed | 25 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Suman |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Meoli Kalan |
| Taluk / tehsil | Fatehabad |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03858 |
In context
13 applications in Agra since January 2022 are in the same category (Mining): 8 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.2 acres, this one is smaller than 92% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Meoli Kalan, Fatehabad, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos.… — environmental approval granted, 500 m away
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — more information requested, 2.7 km away
- Proposed Fuel station of M/S BP Mobility Limited — in-principle approval, conditions pending, 3.3 km away
- The diversion of road side protected forest strip for the construction of… — forest land use approved, 3.5 km away
- The Diversion of Road Side Protected Forest Land on Agra-Bah-Kachaura Ghat… — forest land use approved, 3.5 km away
- The Diversion of Road Side Protected Forest Land for the Construction Pf… — forest land use approved, 3.7 km away
- 765 kV D/c Dausa-Ghiror Transmission Line — in-principle approval, conditions pending, 7.1 km away
- Proposed Retail Outlet by Hindustan Petroleum Corporation Ltd. at Km.-18 Ch.… — forest land use approved, 7.5 km away
More from Suman in Agra
- Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos.… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.