Quick answers
What is this project?
The Diversion of Road Side Protected Forest Land for the Construction Pf Approach (Entry & Exit) to the M/S Rrr Infra Developers, Agra "ahinsa the Grand Green Valley Phase 1 & 2" (Residential Colony) on Agra-Bah-Kachaura Ghat Maarg (SH-62) Between Km Stone 19 & 22 Lhs at Khasara No.-1003/1/2 & 1003/1/3, Village–kolara Kalan , Tehsil- Fatehabad, District–agra is an approved building project in Kaulara Kalan, Fatehabad, Agra, Uttar Pradesh. The site covers 3.8 acres.
Who is building it?
The applicant is R R R Infra Developers.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 7 Sept 2026), as of 27 Nov 2026.
Where is it?
In Kaulara Kalan, Fatehabad, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh; a site of 3.8 acres and 240 m² of forest land.
When was it filed?
The application was filed on 4 Apr 2025.
Project details
| Official title | Proposal for the Diversion of Road Side Protected Forest Land for the Construction Pf Approach (Entry & Exit) to the M/S Rrr Infra Developers, Agra "ahinsa the Grand Green Valley Phase 1 & 2" (Residential Colony) on Agra-Bah-Kachaura Ghat Maarg (SH-62) Between Km Stone 19 & 22 Lhs at Khasara No.-1003/1/2 & 1003/1/3, Village–kolara Kalan , Tehsil- Fatehabad, District–agra. |
|---|---|
| Status | Forest land use approved |
| Status since | 7 Sept 2026 |
| Application filed | 4 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | R R R Infra Developers |
| Use | Other |
| Land area | 3.8 acres (1.5 ha) |
| Forest land | 240 m² |
| Project cost | ₹85 lakh |
| Village / locality | Kaulara Kalan |
| Taluk / tehsil | Fatehabad |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06363 |
In context
39 applications in Agra since January 2022 are in the same category (Buildings & townships): 16 approved, 16 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.8 acres, this one is smaller than 56% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kaulara Kalan, Fatehabad, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of Road Side Protected Forest Land on Agra-Bah-Kachaura Ghat… — forest land use approved, 250 m away
- The diversion of road side protected forest strip for the construction of… — forest land use approved, 350 m away
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — more information requested, 1.1 km away
- Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos.… — environmental approval granted, 3.7 km away
- Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos.… — environmental approval granted, 3.8 km away
- Proposed Retail Outlet by Hindustan Petroleum Corporation Ltd. at Km.-18 Ch.… — forest land use approved, 3.8 km away
- Diversion of 0.0957 Hectare of protected Forest land under Social forestry… — forest land use approved, 5.6 km away
- "UP Defence Industrial Corridor" — under environmental review, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.