Quick answers
What is this project?
"Ordinary Soil Excavation Project" at Gata No. 711,714,775,798,781 (Total area 2.5906 Ha.) is an approved mining project in Mawai Thakuran, Sambhal, Uttar Pradesh. The site covers 6.4 acres.
Who is building it?
The applicant is Mr Yogesh Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jun 2026), as of 27 Nov 2026.
Where is it?
In Mawai Thakuran, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 6.4 acres.
When was it filed?
The application was filed on 11 Mar 2026.
Project details
| Official title | "Ordinary Soil Excavation Project" at Gata No. 711,714,775,798,781 (Total area 2.5906 Ha.) located in Village – Mawai Thakuran, Tehsil & District-Sambhal, Uttar Pradesh, Prop. Shri Yogesh Kumar S/o Shri Param Singh |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Jun 2026 |
| Application filed | 11 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mr Yogesh Kumar |
| Land area | 6.4 acres (2.6 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Mawai Thakuran |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03910 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.4 acres, this one is smaller than 51% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mawai Thakuran, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining" Project at Ga ta No.- 1232, 1293, Village-Bela, Tehsil-… — initial checks, 6.1 km away
- "Soil Excavation Project" at Gata No. 858/2, 867/2, 870/2, 868, 872/1, 872/2,… — under environmental review, 6.2 km away
- Ordinary Soil Mining Project — environmental approval granted, 6.3 km away
- Ordinary Soil Excavation Project — environmental approval granted, 6.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 6.7 km away
- Ordinary Soil Mine — environmental approval granted, 6.7 km away
- Ordinary Soil Mine — environmental approval granted, 6.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 7.1 km away
More from Mr Yogesh Kumar in Sambhal
- "Ordinary Soil Excavation Mining Project" at Gata No. 293, 342 Mining Lease… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.