"Ordinary Soil Mining" Project at Ga ta No.- 1232, 1293, Village-Bela, Tehsil- Sambhal, District- Sambhal, U.P. (Area – 0.8300 ha). Shri Sunil Kumar is a proposed mining project in Bela, Sambhal, Uttar Pradesh. The site covers 2.1 acres.
Who is building it?
The applicant is Sunil Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bela, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹12 lakh and a site of 2.1 acres.
When was it filed?
The application was filed on 8 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 14 Nov 2026 |
| Application filed | 8 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Kumar |
| Land area | 2.1 acres (0.8 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Bela |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04470 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.1 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Bela, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing distillery unit from 250 KLD to 300 KLD on C… — initial checks, 2.6 km away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted, 2.7 km away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — cleared for impact study, 2.7 km away
- Proposed Expansion of Existing Sugar Unit From 9000 Tcd to 14000 Tcd Without… — environmental approval granted, 2.7 km away
- "Ordinary Soil Mining" Project at Gata No.- 291कमि, 293, 318, 336, 337, 338,… — environmental approval granted, 3.1 km away
- "Ordinary Soil Excavation Mining Project" at Gata No. 293, 342 Mining Lease… — environmental approval granted, 3.2 km away
- "Ordinary Soil Mining" Project at Gata No.- 263, 283, 285, 284, 295, Village-… — under environmental review, 3.4 km away
- Ordinary Soil Excavation Project — environmental approval granted, 5.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.