Quick answers
What is Ordinary Soil Mine?
Ordinary Soil Mine is a proposed mining project in Sheshpur Nari, Unnao, Uttar Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Red Panda Infra Developers LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Sheshpur Nari, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17 lakh and a site of 2.3 acres.
When was it filed?
The application was filed on 28 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 28 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Red Panda Infra Developers LLP |
| Land area | 2.3 acres (1 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Sheshpur Nari |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03935 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.3 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Sheshpur Nari, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Project — environmental approval granted, 1.2 km away
- Habib Fashion (Unit-Ii) — lapsed, 1.9 km away
- Proposed protected forest land to be diverted for Entry/Exit Approach to BPCL… — lapsed, 3.2 km away
- Group Housing/Villa/Club and Commercials — environmental approval granted, 3.4 km away
- "gokuldham" Affordable Housing Scheme Under Pradhanmantri Awas Yojna — environmental approval granted, 3.4 km away
- 24 F of cable laying from Shuklaganj to Gandhi Tiraha to PD Nagar BSNL TE… — more information requested, 3.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 4.1 km away
- Proposed expansion of existing Rolling Mill (Steel Rolled Bars with Structural… — environmental approval granted, 4.2 km away
More from Red Panda Infra Developers LLP in Unnao
- Ordinary Soil Mine — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.