Quick answers
What is this project?
Proposed protected forest land to be diverted for Entry/Exit Approach to BPCL Retail Outlet is a lapsed fuel station in Unnao Nagar Palika, Unnao, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
No. The application was lapsed on 17 Jun 2025, so it is no longer under consideration.
Where is it?
In Unnao Nagar Palika, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.8 acres and 1,460 m² of forest land.
When was it filed?
The application was filed on 28 Mar 2025.
Project details
| Official title | Proposed protected forest land to be diverted for Entry/Exit Approach to BPCL Retail Outlet at Village: - Shekhpur, Tehsil: - Unnao, District: - Unnao. |
|---|---|
| Status | Lapsed |
| Status since | 17 Jun 2025 |
| Application filed | 28 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,100 m² |
| Forest land | 1,460 m² |
| Project cost | ₹65 lakh |
| Village / locality | Unnao Nagar Palika |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05224 |
In context
13 applications in Unnao since January 2022 are in the same category (Fuel stations): 9 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.8 acres, this one is smaller than 77% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Unnao Nagar Palika, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Mine — under environmental review, 3.2 km away
- Proposed protected forest land to be diverted for proposed CNG Station… — more information requested, 3.3 km away
- Diverted for proposed CNG Station facility with existing (Pre operating) IOCL… — lapsed, 3.3 km away
- Group Housing/Villa/Club and Commercials — environmental approval granted, 3.3 km away
- "gokuldham" Affordable Housing Scheme Under Pradhanmantri Awas Yojna — environmental approval granted, 3.3 km away
- Proposed expansion of existing Rolling Mill (Steel Rolled Bars with Structural… — environmental approval granted, 4 km away
- Proposed expansion of existing Rolling Mill (Steel Rolled Bars with Structural… — more information requested, 4 km away
- Ordinary Soil Excavation Project — environmental approval granted, 4.1 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Unnao
- Proposed Forest Fand to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
4 Bharat Petroleum Corporation (BPCL) projects in Unnao
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.