Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 225, 227, Village- Arjunpur Khurd, Tehsil- Chandausi, District-Sambhal, U.P. (Area –1.9800 ha). Shri Sumit Sharma is a proposed mining project in Arjunpur Khurd, Chandausi, Sambhal, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is sUMIT SHARMA.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Arjunpur Khurd, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 11 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 11 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | sUMIT SHARMA |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Arjunpur Khurd |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03956 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.9 acres, this one is smaller than 69% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 22.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Arjunpur Khurd, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Arjunpur Khurd Soil Excavation Project" at Gata No. 171, 438, 170,… — environmental approval granted, 250 m away
- "Ordinary Soil Mining Project" at Gata 403, 197, 401, 195, 343, 398 & 213 — environmental approval granted, 350 m away
- Arjunpur khurd Soil Mining Project — under environmental review, 400 m away
- "Ordinary Soil Mining" Project at Gata No.- 268, 280, 281, 293, 294, 326, 331,… — environmental approval granted, 650 m away
- "Ordinary Soil Mining" Project at Gata No.- 435, 441, 448, 467, 468, 469, 470,… — under environmental review, 1.2 km away
- Ordinary Earthmining at Gatano.-636,147,603,601,602,637,588 — environmental approval granted, 1.2 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 58, 81/1Mi, 81/1, 81/2,… — under environmental review, 1.8 km away
- Ordinary Soil Mining Project Form Gata No: 321,237,399,398,466,463,481,283,609,… — under environmental review, 2.1 km away
More from sUMIT SHARMA in Sambhal
- "Ordinary Soil Mining" Project at Gata No.- 268, 280, 281, 293, 294, 326, 331,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.