Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 435, 441, 448, 467, 468, 469, 470, Village- Kumarpur, Tehsil- Chandausi, District-Sambhal, U.P. (Area –2.2065 ha). Shri Deepanshu Sharma is a proposed mining project in Kanwarpur, Chandausi, Sambhal, Uttar Pradesh. The site covers 5.5 acres.
Who is building it?
The applicant is Deepanshu Sharma.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kanwarpur, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 5.5 acres.
When was it filed?
The application was filed on 1 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 1 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Deepanshu Sharma |
| Land area | 5.5 acres (2.2 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Kanwarpur |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04385 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.5 acres, this one is smaller than 63% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 15.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Kanwarpur, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earthmining at Gatano.-636,147,603,601,602,637,588 — environmental approval granted, 350 m away
- Ordinary Soil Mining Project Form Gata No: 321,237,399,398,466,463,481,283,609,… — under environmental review, 1000 m away
- "Ordinary Soil Mining" Project at Gata No.- 225, 227, Village- Arjunpur Khurd,… — under environmental review, 1.2 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 58, 81/1Mi, 81/1, 81/2,… — under environmental review, 1.2 km away
- Proposed "Arjunpur Khurd Soil Excavation Project" at Gata No. 171, 438, 170,… — environmental approval granted, 1.4 km away
- "Ordinary Soil Mining Project" at Gata 403, 197, 401, 195, 343, 398 & 213 — environmental approval granted, 1.5 km away
- Arjunpur khurd Soil Mining Project — under environmental review, 1.5 km away
- "Ordinary Soil Mining" Project at Gata No.- 268, 280, 281, 293, 294, 326, 331,… — environmental approval granted, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.