Quick answers
What is "Sand/Morrum Mining" from Riverbed of Ken River?
"Sand/Morrum Mining" from Riverbed of Ken River is an approved mining project in Bakchha Khadar, Maudaha, Hamirpur, Uttar Pradesh. The site covers 30 acres.
Who is building it?
The applicant is Meera.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Nov 2026), as of 27 Nov 2026.
Where is it?
In Bakchha Khadar, Maudaha, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 30 acres.
When was it filed?
The application was filed on 4 May 2026.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Ken River at Village- Bakchha khadar, Khand 29/3 (Gata no. 49/7, 95/1, 2, 3, 11, 8/1, 25, 26, 26/1Ka, 29Ka, 30, 34, 38/1, 12/1, 24/2, 24/3), Lease Area- 12.145 Ha. (30 Acres), Tehsil- Maudaha, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Kanha Construction (Prop.- Meera Devi) |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Nov 2026 |
| Application filed | 4 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Meera |
| Land area | 30 acres (12.2 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Bakchha Khadar |
| Taluk / tehsil | Maudaha |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04000 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 May 2026 (this page) | Environmental approval granted | 30 acres | ₹1.3 crore |
| Early planning filed 16 Sept 2025 | Cleared for impact study | 30 acres | ₹1.3 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is smaller than 87% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Bakchha Khadar, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 0 m away
- "Sand/Morrum Mining" from Riverbed of Ken River — more information requested, 600 m away
- "Sand/Morrum Mining" from Riverbed of Ken River — more information requested, 1.1 km away
- Proposed riverbed morrum mining project from Ken River of M/s Lorikeets… — under environmental review, 2.4 km away
- Proposed riverbed morrum mining project from Ken River of M/s Lorikeets… — initial checks, 3.8 km away
- Proposed riverbed morrum mining project from Ken River of M/s Lorikeets… — cleared for impact study, 3.8 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 5.1 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 5.1 km away
More from Meera in Hamirpur
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.