What is Developing? Open the mapMap

Initial checksMining · Hamirpur, Uttar Pradesh

Proposed riverbed morrum mining project from Ken River of M/s Lorikeets Estates Private Limited Director- Gata No. 244, 237, 238, 239/1, 240, 241, 242, 243/1, 243/2, 48/124 (Khand No. 30/2), Village- Bhulsi Khadar, Tehsil - Maudaha, District - Hamirpur, Uttar Pradesh, Uttar Pradesh. Sanctioned Lease Area- 36.4370 ha

Proposed riverbed morrum mining project from Ken River of M/s Lorikeets Estates Private Limited Director- Gata No. 244, 237, 238, 239/1, 240, 241, 242, 243/1, 243/2, 48/124 (Khand No. 30/2), Village- Bhulsi Khadar, Tehsil - Maudaha, District - Hamirpur, Uttar Pradesh, Uttar Pradesh. Sanctioned Lease Area- 36.4370 ha is a proposed mining project in Bhulsi, Maudaha, Hamirpur, Uttar Pradesh. The site covers 90 acres. Its stated project cost is ₹3.1 crore. As of 27 Nov 2026, its status is “Initial checks” (since 20 Nov 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed morrum mining project from Ken River of M/s Lorikeets Estates Private Limited Director- Gata No. 244, 237, 238, 239/1, 240, 241, 242, 243/1, 243/2, 48/124 (Khand No. 30/2), Village- Bhulsi Khadar, Tehsil - Maudaha, District - Hamirpur, Uttar Pradesh, Uttar Pradesh. Sanctioned Lease Area- 36.4370 ha is a proposed mining project in Bhulsi, Maudaha, Hamirpur, Uttar Pradesh. The site covers 90 acres.

Who is building it?

The applicant is Lorikeets Estates Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Bhulsi, Maudaha, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.1 crore and a site of 90 acres.

When was it filed?

The application was filed on 6 Oct 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed morrum mining project from Ken River of M/s Lorikeets Estates Private…

Project details

StatusInitial checks
Status since20 Nov 2026
Application filed6 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantLorikeets Estates Private Limited
Land area90 acres (36.4 ha)
Project cost₹3.1 crore
Village / localityBhulsi
Taluk / tehsilMaudaha
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04304

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Oct 2026 (this page)Initial checks90 acres₹3.1 crore
Early planning filed 9 Oct 2025Cleared for impact study90 acres₹3.1 crore

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Bhulsi, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.