Quick answers
What is this project?
Proposed riverbed morrum mining project from Ken River of M/s Lorikeets Estates Private Limited Director- Gata No. 244, 237, 238, 239/1, 240, 241, 242, 243/1, 243/2, 48/124 (Khand No. 30/2), Village- Bhulsi Khadar, Tehsil - Maudaha, District - Hamirpur, Uttar Pradesh, Uttar Pradesh. Sanctioned Lease Area- 36.4370 ha is a proposed mining project in Bhulsi, Maudaha, Hamirpur, Uttar Pradesh. The site covers 90 acres.
Who is building it?
The applicant is Lorikeets Estates Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bhulsi, Maudaha, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.1 crore and a site of 90 acres.
When was it filed?
The application was filed on 6 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed morrum mining project from Ken River of M/s Lorikeets Estates Private…
Project details
| Status | Initial checks |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 6 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Lorikeets Estates Private Limited |
| Land area | 90 acres (36.4 ha) |
| Project cost | ₹3.1 crore |
| Village / locality | Bhulsi |
| Taluk / tehsil | Maudaha |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04304 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Oct 2026 (this page) | Initial checks | 90 acres | ₹3.1 crore |
| Early planning filed 9 Oct 2025 | Cleared for impact study | 90 acres | ₹3.1 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Bhulsi, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed morrum mining project from Ken River of M/s Lorikeets… — cleared for impact study, 0 m away
- Proposed riverbed morrum mining project from Ken River of M/s Lorikeets… — under environmental review, 1.4 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 1.4 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 1.4 km away
- Riverbed Sand/Morrum Mining from Riverbed of Ken River, Village- Bhulsi,… — environmental approval granted, 2.5 km away
- Riverbed Sand/Morrum Mining from Riverbed of Ken River, Village- Bhulsi,… — cleared for impact study, 2.5 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — environmental approval granted, 3.8 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.