What is Developing? Open the mapMap

Cleared for impact studyRoads & highways · Pilibhit, Uttar Pradesh

High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-6, from Ch. 273+415 to Ch. 348+373)

High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-6, from Ch. 273+415 to Ch. 348+373) is a proposed road project in Silra, Bilaspur, Pilibhit, Uttar Pradesh. Its stated project cost is ₹3,223.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Mar 2026).

See it on the live map All projects in Pilibhit

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleDevelopment of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-6, from Ch. 273+415 to Ch. 348+373).
StatusCleared for impact study
Status since5 Mar 2026
Application filed23 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorRoads & highways
ApplicantNational Highway Authority of India
Project cost₹3,223.2 crore
Village / localitySilra
Taluk / tehsilBilaspur
DistrictPilibhit
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04122

In context

10 applications in Pilibhit since January 2022 are in the same category (Roads & highways): 2 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.

Where it is

Silra, Bilaspur, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.