Quick answers
What is this project?
Ordinary Soil Mining Project at Gata No.- 473अ, 473ब, Village-Uchagaon, Tehsil-Goverdhan, District- Mathura, Uttar Pradesh (Area-2.3114 Ha). M/S Harendra Contractor, Shri Narendra Singh is a proposed mining project in Unchagaon, Chhata, Mathura, Uttar Pradesh. The site covers 5.7 acres.
Who is building it?
The applicant is Narendra Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Unchagaon, Chhata, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹13 lakh and a site of 5.7 acres.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Narendra Singh |
| Land area | 5.7 acres (2.3 ha) |
| Project cost | ₹13 lakh |
| Village / locality | Unchagaon |
| Taluk / tehsil | Chhata |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04157 |
In context
28 applications in Mathura since January 2022 are in the same category (Mining): 10 approved, 18 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.7 acres, this one is smaller than 57% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 11.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Unchagaon, Chhata, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Mining" Project at Gata No.- 473अ, 473ब, Village-… — initial checks, 150 m away
- Kirtan Bihari Temple — lapsed, 2.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — lapsed, 4.4 km away
- Diversion of 0.0650 Hectares of Protected Forest Land in Khasra No. 870/1,… — forest land use approved, 6.1 km away
- Proposed Group Housing Project (Shri Divine Vedaa) on Khasra No. 588 — environmental approval granted, 6.5 km away
- Proposed "Ordinary Soil Mining" Project at Gata No.- 145/2, Village-Dahrauli,… — initial checks, 9.4 km away
- The Diversion of Road Side Protected Forest Land on… — forest land use approved, 9.4 km away
- Diversion of protected forest land for Construction of approach road to the… — under forest review, 9.8 km away
More from Narendra Singh in Mathura
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.