Forest land use approvedFuel stations · Mathura, Uttar Pradesh

The Diversion of Road Side Protected Forest Land on Kausi-Goverdhan-Saunkh-Farah Maarg (SH-142) Km Stone 08, Ch-7.863, Lhs at Khasara No.-454/1, Village–jaav, Tehsil- Chhata, District–mathura (Up) for the Construction of Approach to Proposed Iocl Nro by IOCL

The Diversion of Road Side Protected Forest Land on Kausi-Goverdhan-Saunkh-Farah Maarg (SH-142) Km Stone 08, Ch-7.863, Lhs at Khasara No.-454/1, Village–jaav, Tehsil- Chhata, District–mathura (Up) for the Construction of Approach to Proposed Iocl Nro by IOCL is an approved fuel station in Jau, Chhata, Mathura, Uttar Pradesh. The site covers 0.6 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 22 Apr 2026).

See it on the live map All projects in Mathura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

The Diversion of Road Side Protected Forest Land on Kausi-Goverdhan-Saunkh-Farah Maarg (SH-142) Km Stone 08, Ch-7.863, Lhs at Khasara No.-454/1, Village–jaav, Tehsil- Chhata, District–mathura (Up) for the Construction of Approach to Proposed Iocl Nro by IOCL is an approved fuel station in Jau, Chhata, Mathura, Uttar Pradesh. The site covers 0.6 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 22 Apr 2026), as of 27 Nov 2026.

Where is it?

In Jau, Chhata, Mathura, Uttar Pradesh.

How big is it?

It has a stated cost of ₹85 lakh; a site of 0.6 acres and 790 m² of forest land.

When was it filed?

The application was filed on 22 May 2025.

Project details

Official titleProposal for the Diversion of Road Side Protected Forest Land on Kausi-Goverdhan-Saunkh-Farah Maarg (SH-142) Km Stone 08, Ch-7.863, Lhs at Khasara No.-454/1, Village–jaav, Tehsil- Chhata, District–mathura (Up) for the Construction of Approach to Proposed Iocl Nro.
StatusForest land use approved
Status since22 Apr 2026
Application filed22 May 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area2,300 m²
Forest land790 m²
Project cost₹85 lakh
Village / localityJau
Taluk / tehsilChhata
DistrictMathura
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05204

In context

9 applications in Mathura since January 2022 are in the same category (Fuel stations): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jau, Chhata, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Mathura

3 Indian Oil Corporation (IOCL) projects in Mathura
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.