What is Developing? Open the mapMap

Under environmental reviewMining · Jalaun, Uttar Pradesh

"Sand/Morrum Mine" from Riverbed of Yamuna River

"Sand/Morrum Mine" from Riverbed of Yamuna River is a proposed mining project in Jitamau Diwara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres. Its stated project cost is ₹6.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 23 Oct 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mine" from Riverbed of Yamuna River?

"Sand/Morrum Mine" from Riverbed of Yamuna River is a proposed mining project in Jitamau Diwara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres.

Who is building it?

The applicant is sHAiLENDRA KUMAR.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Jitamau Diwara, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹6.3 crore and a site of 37.1 acres.

When was it filed?

The application was filed on 8 Aug 2026.

Project details

Official title"Sand/Morrum Mine" from Riverbed of Yamuna River at Village- Jeetamau Deewara, Gata No.- 120/1, Khand No.- 05, Lease Area- 15.00 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s Anandeshwar Motors Pvt. Ltd. (Director- Shri Shailendra Kumar)
StatusUnder environmental review
Status since23 Oct 2026
Application filed8 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantsHAiLENDRA KUMAR
Land area37.1 acres (15 ha)
Project cost₹6.3 crore
Village / localityJitamau Diwara
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04160

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is smaller than 66% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 148.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Jitamau Diwara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from sHAiLENDRA KUMAR in Jalaun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.