Quick answers
What is "Sand/Morrum Mine" from Riverbed of Yamuna River?
"Sand/Morrum Mine" from Riverbed of Yamuna River is a proposed mining project in Jitamau Diwara, Kalpi, Jalaun, Uttar Pradesh. The site covers 37.1 acres.
Who is building it?
The applicant is Sachin Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Jitamau Diwara, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹6 crore and a site of 37.1 acres.
When was it filed?
The application was filed on 8 Aug 2026.
Project details
| Official title | "Sand/Morrum Mine" from Riverbed of Yamuna River at Village- Jeetamau Deewara, Gata No.- 88/2, 89 & 120/1, Khand No. 4, Lease Area- 15.00 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s Baba Amarnath Trading Company (Prop. Shri Sachin Kumar Singh S/o Shri Ram kumar Singh) |
|---|---|
| Status | Under environmental review |
| Status since | 23 Oct 2026 |
| Application filed | 8 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sachin Singh |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹6 crore |
| Village / locality | Jitamau Diwara |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04502 |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 37.1 acres, this one is smaller than 66% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 175.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Jitamau Diwara, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Yamuna River — lapsed, 0 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 250 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — lapsed, 250 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — lapsed, 350 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 350 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — environmental approval granted, 550 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — cleared for impact study, 550 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review, 850 m away
More from Sachin Singh in Jalaun
- "Sand/Morrum Mine" from Riverbed of Yamuna River — under environmental review
- "Sand/Morrum Mine" from Riverbed of Yamuna River — lapsed
- "Sand/Morrum Mine" from Riverbed of Yamuna River — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.