Quick answers
What is this project?
Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River River at Gata No- 01, 02, 03, 06/2, Khand No. 26/3, Area- 21.843 ha, Village- Ghurauli, Tehsil- Sarila, District- Hamirpur, Uttar Pradesh of M/s Kamtanath Exploration Private Limited, Director Smt. Sandhya Devi is a proposed mining project in Ghurauli, Sarila, Hamirpur, Uttar Pradesh. The site covers 54 acres.
Who is building it?
The applicant is Sandhya Devi.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Ghurauli, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹49 lakh and a site of 54 acres.
When was it filed?
The application was filed on 25 Feb 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 29 Jun 2026 |
| Application filed | 25 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sandhya Devi |
| Land area | 54 acres (21.8 ha) |
| Project cost | ₹49 lakh |
| Village / locality | Ghurauli |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04239 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 54 acres, this one is larger than 55% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 101.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Ghurauli, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review, 400 m away
- Proposed Project of riverbed Sand/Morrum Mining project located on Betwa River… — under environmental review, 1 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 1 km away
- "Morrum Mining" from Riverbed of Betwa River — under environmental review, 1.6 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 2.4 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 2.4 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli,… — environmental approval granted, 3.2 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli,… — cleared for impact study, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.