Quick answers
What is this project?
Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli, (Khand No. 26/8, Area- 36.437 Ha.) Tehsil- Sarila, District– Hamirpur, Uttar Pradesh Developed by M/s S.S.K. Devcon Pvt. Ltd. (Shri Satyendra Singh Kushwah) is a proposed mining project in Chandwari, Sarila, Hamirpur, Uttar Pradesh. The site covers 85.1 acres.
Who is building it?
The applicant is Ssk Devcon Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 May 2023), as of 27 Nov 2026.
Where is it?
In Chandwari, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.9 crore and a site of 85.1 acres.
When was it filed?
The application was filed on 29 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli, (Khand No.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 May 2023 |
| Application filed | 29 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ssk Devcon Private Limited |
| Land area | 85.1 acres (34.4 ha) |
| Project cost | ₹1.9 crore |
| Village / locality | Chandwari |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01374 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Mar 2024 | Environmental approval granted | 85.1 acres | ₹1.9 crore |
| Early planning filed 29 May 2023 (this page) | Cleared for impact study | 85.1 acres | ₹1.9 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 85.1 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Chandwari, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Chandwari Ghurauli,… — environmental approval granted, 0 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 850 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 850 m away
- "Morrum Mining" from Riverbed of Betwa River — under environmental review, 1.7 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 2.3 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01… — environmental approval granted, 2.7 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Jigni, Gata No.- 01… — cleared for impact study, 2.7 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River River at… — under environmental review, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.