Quick answers
What is this project?
Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 644 Kha, Village- Karhara Kalan, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.1600 ha.), Shri Sulabh Saxena S/o Late Shri Suraj Sahai Saxena is an approved mining project in Karahra Kalan, Mahoba, Uttar Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Sulabh Saxena.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Aug 2026), as of 27 Nov 2026.
Where is it?
In Karahra Kalan, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹68 lakh and a site of 2.9 acres.
When was it filed?
The application was filed on 16 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Aug 2026 |
| Application filed | 16 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sulabh Saxena |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹68 lakh |
| Village / locality | Karahra Kalan |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04252 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.9 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Karahra Kalan, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — environmental approval granted, 1000 m away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 1.6 km away
- Environmental clearance for proposed building stone (Granite and Dolostone… — environmental approval granted, 2.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 2.4 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — forest land use approved, 4.7 km away
- Proposed Project of "Granite and Dolostone Ballast Gitti Mining Project" at… — environmental approval granted, 5.1 km away
- Building Stone Granite Granite (Khanda,Boulder, Bailast (Gitti)) mining… — environmental approval granted, 5.1 km away
- Building Stone Granite Granite (Khanda,Boulder, Bailast (Gitti)) mining… — cleared for impact study, 5.1 km away
More from Sulabh Saxena in Mahoba
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.