Project details
| Official title | Proposed "Ordinary Earth Excavation/Mining Project" at Gata No.- 60 Village: Nandakheda, Tehsil: Raebareli, District- Raebareli, Uttar Pradesh. |
|---|---|
| Status | Initial checks |
| Status since | 14 Nov 2026 |
| Application filed | 8 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Kumar |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Nandakhera |
| Taluk / tehsil | Rae Bareli |
| District | Rae Bareli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04263 |
In context
26 applications in Rae Bareli since January 2022 are in the same category (Mining): 21 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.7 acres, this one is smaller than 58% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 7.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Nandakhera, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ordinary Soil Mining Project of Prop. Shri Ajay Singh located at… — environmental approval granted, 300 m away
- No increase in pollution load certificate" for enhancement of installed… — initial checks, 7.1 km away
- Ordinary Earth Mining Project Gata No.- 185, 168मि0, Village: Rajamau, Tehsil:… — initial checks, 7.6 km away
- Protected Forest Land Proposed for construction of Exit/Entry Approach to M/S… — lapsed, 8.3 km away
- Spices Board (Ministry of Commerce & Industry Govt. of India), Project for… — lapsed, 9.5 km away
- Spices Board (Ministry of Commerce & Industry Govt. of India), Project for… — lapsed, 9.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 10.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 12.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.