Project details
| Official title | Spices Board (Ministry of Commerce & Industry Govt. of India), Project for Laying of Electricity Cable along with road at Lucknow-Prayagraj Marg (NH-30) from Km. 61.75 To Km. 63.21 (On L.H.S.), Total KM 1.460 & 0.0248 Ha. In Raebareli Forest Division, District-Raebareli (UP). |
|---|---|
| Status | Lapsed |
| Status since | 12 Jul 2025 |
| Application filed | 18 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Commerce & Industry |
| Land area | 200 m² |
| Forest land | 250 m² |
| Project cost | ₹43 lakh |
| Village / locality | Pyarepur |
| Taluk / tehsil | Rae Bareli |
| District | Rae Bareli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05291 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Mar 2025 (this page) | Lapsed | 0 acres | ₹43 lakh |
| New project filed 10 Jul 2024 | Lapsed | 1.1 acres | ₹43 lakh |
In context
8 applications in Rae Bareli since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pyarepur, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Spices Board (Ministry of Commerce & Industry Govt. of India), Project for… — lapsed, 50 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 1.8 km away
- No increase in pollution load certificate" for enhancement of installed… — initial checks, 4.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 7 km away
- Protected Forest Land Proposed for construction of Exit/Entry Approach to M/S… — lapsed, 8.3 km away
- Proposed Ordinary Soil Mining Project of Prop. Shri Ajay Singh located at… — environmental approval granted, 9.2 km away
- Proposed "Ordinary Earth Excavation/Mining Project" — initial checks, 9.5 km away
- Proposed "Ordinary Earth Mining Project" of M/s Navneet Trading Company, Pro.… — environmental approval granted, 11.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.