Quick answers
What is this project?
SAND/MORRUM MINING ALONG YAMUNA RIVERBED at Khand No- 31/6, Gata No.- 01, 02, Village- Patyora Danda, Tehsil- Hamirpur, District- Hamirpur, State- Uttar Pradesh, over an area of 36.437 ha is a proposed mining project in Patyaura, Hamirpur, Uttar Pradesh. The site covers 90 acres.
Who is building it?
The applicant is Gyan Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Patyaura, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹81 lakh and a site of 90 acres.
When was it filed?
The application was filed on 16 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Jul 2026 |
| Application filed | 16 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gyan Gupta |
| Land area | 90 acres (36.4 ha) |
| Project cost | ₹81 lakh |
| Village / locality | Patyaura |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04277 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 360.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Patyaura, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg,… — under environmental review, 350 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg,… — cleared for impact study, 350 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Patyora, Khand No.-… — lapsed, 350 m away
- Proposed Project of riverbed "Morrum Mining Project for River Yamuna at Gata… — cleared for impact study, 450 m away
- Morrum Mining from Yamuna Riverbed — cleared for impact study, 800 m away
- "Morrum Mine" Khand Sankhya-31/8, Gata No.- 01, 02, 03 over an area of 36.437… — environmental approval granted, 1 km away
- "Morrum Mine" Khand Sankhya-31/8, Gata No.- 01, 02, 03 over an area of 36.437… — cleared for impact study, 1 km away
- "Riverbed Sand Mine" from Yamuna River, Village- Patyora, (Khand No. 31/3,… — environmental approval granted, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.