What is Developing? Open the mapMap

Cleared for impact studyMining · Hamirpur, Uttar Pradesh

"Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg, Patyora Danda (Old name: Patyora), Khand No.- 31/5 (Surauli Buzurg- Gata No. 01; Patyora Danda- Gata No. 01, 02), Lease Area- 36.437 Ha. (90 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Parihar Construction (Partner- Shri Balwant Singh & Shri Dushyant Singh)

"Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg, Patyora Danda (Old name: Patyora), Khand No.- 31/5 (Surauli Buzurg- Gata No. 01; Patyora Danda- Gata No. 01, 02), Lease Area- 36.437 Ha. (90 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Parihar Construction (Partner- Shri Balwant Singh & Shri Dushyant Singh) is a proposed mining project in Surauli Buzurg Danda, Hamirpur, Uttar Pradesh. The site covers 90 acres. Its stated project cost is ₹1.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 12 Jun 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg, Patyora Danda (Old name: Patyora), Khand No.- 31/5 (Surauli Buzurg- Gata No. 01; Patyora Danda- Gata No. 01, 02), Lease Area- 36.437 Ha. (90 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Parihar Construction (Partner- Shri Balwant Singh & Shri Dushyant Singh) is a proposed mining project in Surauli Buzurg Danda, Hamirpur, Uttar Pradesh. The site covers 90 acres.

Who is building it?

The applicant is Parihar Construction.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 12 Jun 2026), as of 27 Nov 2026.

Where is it?

In Surauli Buzurg Danda, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.7 crore and a site of 90 acres.

When was it filed?

The application was filed on 6 Oct 2025.

Project details

StatusCleared for impact study
Status since12 Jun 2026
Application filed6 Oct 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantParihar Construction
Land area90 acres (36.4 ha)
Project cost₹1.7 crore
Village / localitySurauli Buzurg Danda
Taluk / tehsilHamirpur
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03496

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Jun 2026Under environmental review90 acres₹1.7 crore
Early planning filed 6 Oct 2025 (this page)Cleared for impact study90 acres₹1.7 crore

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 270.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.

Where it is

Surauli Buzurg Danda, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Parihar Construction in Hamirpur

8 Parihar Construction projects in Hamirpur
All 29 Parihar Construction projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.