Quick answers
What is this project?
High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-6, from Ch. 273+415 to Ch. 348+373) is a proposed road project in Abhrajpur, Nawabganj, Bareilly, Uttar Pradesh.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Abhrajpur, Nawabganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3,223.2 crore.
When was it filed?
The application was filed on 27 Apr 2026.
Project details
| Official title | Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package-6, from Ch. 273+415 to Ch. 348+373). |
|---|---|
| Status | Returned to applicant |
| Status since | 23 May 2026 |
| Application filed | 27 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Project cost | ₹3,223.2 crore |
| Village / locality | Abhrajpur |
| Taluk / tehsil | Nawabganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04329 |
In context
13 applications in Bareilly since January 2022 are in the same category (Roads & highways): 2 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Abhrajpur, Nawabganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Sugar unit from 5000 TCD to 11000 TCD — environmental approval granted, 52 km away
- Expansion of existing Sugar unit from 5000 TCD to 11000 TCD — environmental approval granted, 52 km away
- Transfer of Environment clearance from M/s. Dhampur Sugar Mills Ltd. to M/s.… — lapsed, 52.1 km away
- Seeking permission for non-forestry use of Protected Forest land — lapsed, 53.3 km away
- Richauli Soil Mining Project — environmental approval granted, 54 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 54.1 km away
- Proposed Forest Land to be diverted for Laying of Gas Pipe Line along… — more information requested, 54.1 km away
- Protected Forest Land Proposed To be diverted for Entry/Exit Approach Road of… — forest land use approved, 54.2 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.