Quick answers
What is Richauli Soil Mining Project?
Richauli Soil Mining Project is an approved mining project in Richoli, Baheri, Bareilly, Uttar Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Dinesh Kumar Gangwar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jun 2026), as of 27 Nov 2026.
Where is it?
In Richoli, Baheri, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and a site of 2.3 acres.
When was it filed?
The application was filed on 25 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Jun 2026 |
| Application filed | 25 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dinesh Kumar Gangwar |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Richoli |
| Taluk / tehsil | Baheri |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04271 |
In context
6 applications in Bareilly since January 2022 are in the same category (Mining): 5 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Richoli, Baheri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Retail Outlet of INDIAN OIL CORPORATION LIMITED at Bareilly-Almora… — lapsed, 4.5 km away
- (Ex- Post Facto) Protected Forest Land Proposed to be Diverted for Entry/Exit… — lapsed, 4.6 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit Approach Road to… — forest land use approved, 13.3 km away
- Amended BharatNet Project (Damkhauda-Bareilly) — lapsed, 17.5 km away
- Protected Forest Land Land Proposed To be diverted for Entry/Exit Approach… — forest land use approved, 23.6 km away
- Nirbhua Soil Mining Project — initial checks, 28.8 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 29.5 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 29.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.