Project details
| Official title | Building stone (Gitti/boulder/Khanda) mine from Bhukhand No. 725 Mi, (Khand no.- 01) Area–2.024 ha at Village- Janwan, Tehsil- Bara, District- Prayagraj, Uttar Pradesh of M/s Savitri Stone, Shri Durgesh Pratap Singh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Oct 2026 |
| Application filed | 22 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Durgesh Pratap Singh |
| Land area | 5 acres (2 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Janwan |
| Taluk / tehsil | Bara |
| District | Prayagraj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04335 |
In context
155 applications in Prayagraj since January 2022 are in the same category (Mining): 89 approved, 43 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 91% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Janwan, Bara, Prayagraj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved, 3.3 km away
- Proposed increase in Cement production capacity from 2.5 Million TPA to 3.0… — initial checks, 4.1 km away
- Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of… — environmental approval granted, 4.1 km away
- Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of… — environmental approval granted, 4.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to private… — lapsed, 4.1 km away
- Proposed building stone (Gitti, Boulder, Khanda) sand stone mine at bhukhand… — environmental approval granted, 5.4 km away
- Proposed building stone (Gitti, Boulder, Khanda) sand stone mine at bhukhand… — cleared for impact study, 5.4 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — initial checks, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.