What is Developing? Open the mapMap

Under environmental reviewMining · Hamirpur, Uttar Pradesh

"Sand/Morrum Mine" from Riverbed of Betwa River, Village- Patara Dariya, Sahurapur Dariya, Khand no. 8/4 (Patara Dariya- Gata No. 107/83, 111/83, 85; Sahurapur Dariya- Gata no. 01Mi, 02/4), Lease Area – 33.833 ha. (83.56 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- Shri Sandeep Chandak

"Sand/Morrum Mine" from Riverbed of Betwa River, Village- Patara Dariya, Sahurapur Dariya, Khand no. 8/4 (Patara Dariya- Gata No. 107/83, 111/83, 85; Sahurapur Dariya- Gata no. 01Mi, 02/4), Lease Area – 33.833 ha. (83.56 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- Shri Sandeep Chandak is a proposed mining project in Patara Daria, Hamirpur, Uttar Pradesh. The site covers 83.6 acres. Its stated project cost is ₹2.6 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 31 Oct 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Morrum Mine" from Riverbed of Betwa River, Village- Patara Dariya, Sahurapur Dariya, Khand no. 8/4 (Patara Dariya- Gata No. 107/83, 111/83, 85; Sahurapur Dariya- Gata no. 01Mi, 02/4), Lease Area – 33.833 ha. (83.56 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- Shri Sandeep Chandak is a proposed mining project in Patara Daria, Hamirpur, Uttar Pradesh. The site covers 83.6 acres.

Who is building it?

The applicant is Sandeep Chandak.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Patara Daria, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2.6 crore and a site of 83.6 acres.

When was it filed?

The application was filed on 1 Jul 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Patara Dariya, Sahurapur…

Project details

StatusUnder environmental review
Status since31 Oct 2026
Application filed1 Jul 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSandeep Chandak
Land area83.6 acres (33.8 ha)
Project cost₹2.6 crore
Village / localityPatara Daria
Taluk / tehsilHamirpur
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04348

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Jul 2026 (this page)Under environmental review83.6 acres₹2.6 crore
Early planning filed 6 Nov 2025Cleared for impact study83.6 acres₹2.6 crore

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 83.6 acres, this one is larger than 81% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Patara Daria, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sandeep Chandak in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.