Cleared for impact studyMining · Hamirpur, Uttar Pradesh

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Khand No. 18/1, Gata No. 15, 04 Mi, 18, 19, 20, 17, 21, 22, 23, 24, 28, 29, 30, 31Ka, 02/4, Area 36.437 ha

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Khand No. 18/1, Gata No. 15, 04 Mi, 18, 19, 20, 17, 21, 22, 23, 24, 28, 29, 30, 31Ka, 02/4, Area 36.437 ha is a proposed mining project in Bahrauli Daria, Hamirpur, Uttar Pradesh. The site covers 90 acres. Its stated project cost is ₹47 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Oct 2025).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Khand No. 18/1, Gata No. 15, 04 Mi, 18, 19, 20, 17, 21, 22, 23, 24, 28, 29, 30, 31Ka, 02/4, Area 36.437 ha is a proposed mining project in Bahrauli Daria, Hamirpur, Uttar Pradesh. The site covers 90 acres.

Who is building it?

The applicant is Parihar Construction.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Oct 2025), as of 27 Nov 2026.

Where is it?

In Bahrauli Daria, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹47 lakh and a site of 90 acres.

When was it filed?

The application was filed on 23 May 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Khand…

Project details

Official titleProposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River at Khand No. 18/1, Gata No. 15, 04 Mi, 18, 19, 20, 17, 21, 22, 23, 24, 28, 29, 30, 31Ka, 02/4, Area 36.437 ha in Village- Bahrauli Dariya, Sahurapur Dariya, Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh of M/s Parihar Construction, Partner Shri Dushyant Singh and Shri Balwant Singh
StatusCleared for impact study
Status since6 Oct 2025
Application filed23 May 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantParihar Construction
Land area90 acres (36.4 ha)
Project cost₹47 lakh
Village / localityBahrauli Daria
Taluk / tehsilHamirpur
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02978

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Dec 2025Environmental approval granted90 acres₹47 lakh
Early planning filed 23 May 2025 (this page)Cleared for impact study90 acres₹47 lakh

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 180.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Bahrauli Daria, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Parihar Construction in Hamirpur

8 Parihar Construction projects in Hamirpur
All 29 Parihar Construction projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.