What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Ghaziabad, Uttar Pradesh

Proposed Oyster Walk Group Housing Project at Plot Number: - GH- 2C, Oakwood Enclave, Sector-1, Wave City, Tehsil & District- Ghaziabad, Uttar Pradesh by SRSD Infrastructure venture LLP

Proposed Oyster Walk Group Housing Project at Plot Number: - GH- 2C, Oakwood Enclave, Sector-1, Wave City, Tehsil & District- Ghaziabad, Uttar Pradesh by SRSD Infrastructure venture LLP is a proposed residential project in Bayana, Ghaziabad, Uttar Pradesh. It plans 554 units on 5.8 acres. Its stated project cost is ₹1,697 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 7 Apr 2026).

See it on the live map All projects in Ghaziabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Oyster Walk Group Housing Project at Plot Number: - GH- 2C, Oakwood Enclave,…

Project details

StatusCleared for impact study
Status since7 Apr 2026
Application filed12 Feb 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantSrsd Infrastructure Venture LLP
UseResidential
Units554
Basements2
Parking spaces936
Land area5.8 acres (2.4 ha)
Built-up area1,69,465 m² (18,24,104 sq ft)
Plot area23,650 m² (2,54,566 sq ft)
Project cost₹1,697 crore
Village / localityBayana
Taluk / tehsilGhaziabad
DistrictGhaziabad
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04440

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 May 2026Environmental approval granted5.8 acres₹1,697 crore
Early planning filed 12 Feb 2026 (this page)Cleared for impact study5.8 acres₹1,697 crore
Early planning filed 11 Dec 2025Returned to applicant5.8 acres₹1,697 crore
Early planning filed 13 Sept 2025Returned to applicant5.9 acres₹1,697 crore

In context

154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.8 acres, this one is larger than 63% of them.

46 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bayana, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Srsd Infrastructure Venture projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.