Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 31 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajveer Singh |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Farhedi |
| Taluk / tehsil | Bilari |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04468 |
In context
38 applications in Moradabad since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.7 acres, this one is smaller than 79% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 7.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Farhedi, Bilari, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- ''Ordinary Soil Mining Project" at Gata No.– 193, 200, 207, Village- Domghar,… — environmental approval granted, 500 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 900 m away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable — more information requested, 1 km away
- Ordinary Soil Excavation Mine — environmental approval granted, 1.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 1.9 km away
- ''Ordinary Soil Mining Project" at Gata No.- 66, 167, 171, 184, Village-… — environmental approval granted, 3.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 3.5 km away
- Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos.… — environmental approval granted, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.