What is Developing? Open the mapMap

Cleared for impact studyIndustry · Mathura, Uttar Pradesh

Expansion of Dyes Intermediates and Reactive Dyes Manufacturing Plant at Plot No. A-2, UPSIDC Industrial Area, Village Kosi Kotwan, Tehsil Chhata, District Mathura, Uttar Pradesh – 281403 by M/s Bodal Chemicals Limited

Expansion of Dyes Intermediates and Reactive Dyes Manufacturing Plant at Plot No. A-2, UPSIDC Industrial Area, Village Kosi Kotwan, Tehsil Chhata, District Mathura, Uttar Pradesh – 281403 by M/s Bodal Chemicals Limited is a proposed industrial project in Kotban, Chhata, Mathura, Uttar Pradesh. The site covers 6.6 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Jul 2026).

See it on the live map All projects in Mathura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Dyes Intermediates and Reactive Dyes Manufacturing Plant at Plot No. A-2, UPSIDC Industrial Area, Village Kosi Kotwan, Tehsil Chhata, District Mathura, Uttar Pradesh – 281403 by M/s Bodal Chemicals Limited is a proposed industrial project in Kotban, Chhata, Mathura, Uttar Pradesh. The site covers 6.6 acres.

Who is building it?

The applicant is Bodal Chemicals Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 14 Jul 2026), as of 27 Nov 2026.

Where is it?

In Kotban, Chhata, Mathura, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 6.6 acres.

When was it filed?

The application was filed on 12 Jan 2026.

Project details

StatusCleared for impact study
Status since14 Jul 2026
Application filed12 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBodal Chemicals Limited
Land area6.6 acres (2.7 ha)
Project cost₹1.1 crore
Village / localityKotban
Taluk / tehsilChhata
DistrictMathura
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04476

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 8 Sept 2026More information requested6.6 acres₹1.1 crore
Early planning filed 12 Jan 2026 (this page)Cleared for impact study6.6 acres₹1.1 crore

In context

5 applications in Mathura since January 2022 are in the same category (Industry): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kotban, Chhata, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bodal Chemicals Limited in Mathura

3 Bodal Chemicals projects in Mathura
All 12 Bodal Chemicals projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.