What is Developing? Open the mapMap

Under environmental reviewMining · Hamirpur, Uttar Pradesh

Morrum Mining at Betwa River Bed over and area of 7.4050Ha. Khand No.23/2 at Gata No. – 94,87 ,Village- Bhedi Dariya, Tehsil- Sarila, District- Hamirpur, U.P

Morrum Mining at Betwa River Bed over and area of 7.4050Ha. Khand No.23/2 at Gata No. – 94,87 ,Village- Bhedi Dariya, Tehsil- Sarila, District- Hamirpur, U.P is a proposed mining project in Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh. The site covers 18.3 acres. Its stated project cost is ₹70 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 31 Aug 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Morrum Mining at Betwa River Bed over and area of 7.4050Ha. Khand No.23/2 at Gata No. – 94,87 ,Village- Bhedi Dariya, Tehsil- Sarila, District- Hamirpur, U.P is a proposed mining project in Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh. The site covers 18.3 acres.

Who is building it?

The applicant is Vidya Bhushan Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹70 lakh and a site of 18.3 acres.

When was it filed?

The application was filed on 11 Jun 2026.

Project details

StatusUnder environmental review
Status since31 Aug 2026
Application filed11 Jun 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVidya Bhushan Singh
Land area18.3 acres (7.4 ha)
Project cost₹70 lakh
Village / localityBhedi Dariya
Taluk / tehsilSarila
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04498

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 5 Nov 2026Initial checks18.3 acres₹70 lakh
Early planning filed 11 Jun 2026 (this page)Under environmental review18.3 acres₹70 lakh

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 18.3 acres, this one is smaller than 99% of them.

No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.

Where it is

Bhedi Dariya, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.